In import-export activities, choosing the right delivery term directly affects shipping costs, cargo handling responsibilities, and business risks. One of the terms used in international transactions is DPU (Delivered at Place Unloaded).
So, what is DPU? Under the DPU term in Incoterms 2020, the seller must arrange for the transportation of goods to the agreed destination and bear the responsibility for unloading the goods from the arriving means of transport at the destination. The buyer receives the goods after they have been unloaded and is responsible for import customs clearance and related taxes.
To better understand the DPU term, businesses need to grasp the responsibilities of each party, cost allocation, the point of risk transfer, and the differences between DPU, DAP, and DDP.
DPU stands for Delivered at Place Unloaded.
It is one of the 11 delivery terms under the Incoterms 2020 rules issued by the International Chamber of Commerce (ICC).
Under DPU, the seller fulfills their delivery obligation when the goods are transported to the agreed destination, unloaded from the arriving means of transport, and placed at the disposal of the buyer.
The distinctive feature of this term is that the seller bears the responsibility and cost of unloading at the place of delivery. It is also the only rule in Incoterms 2020 that requires the seller to unload the goods at the destination.
DPU was introduced in Incoterms 2020 to replace the DAT (Delivered at Terminal) term in Incoterms 2010.
This change expands the scope of the delivery location. Instead of being limited to a terminal (such as a station, port, or transport hub), DPU allows the parties to choose a more flexible delivery location.
For example:
Thus, DPU helps businesses be more flexible when organizing international transportation and handing over goods.
DPU can be used for all modes of transport, including:
Businesses can use DPU when goods are transported by a single mode or a combination of multiple modes of transport.
To use DPU accurately, businesses need to understand three key factors: the place of delivery, unloading responsibility, and the point of risk transfer.
Under DPU, the seller is responsible for bringing the goods to the destination agreed upon in the contract.
This location can be a seaport, warehouse, factory, or another specific address.
When drafting a contract, businesses should clearly state the exact location and unloading point rather than just the name of the city or country.
Example: DPU VICO Warehouse, Ho Chi Minh City, Vietnam, Incoterms 2020.
Clearly defining the place of delivery helps the parties avoid disputes regarding the scope of transportation, costs, and delivery responsibilities.
An important characteristic of DPU is that risk is only transferred from the seller to the buyer after the goods have been unloaded at the designated delivery location and placed at the buyer's disposal.
This means:
For example, if goods are damaged during unloading at the buyer's warehouse, the risk still belongs to the seller under DPU terms.
This is a key difference compared to DAP, where risk transfers before the goods are unloaded from the transport vehicle.
Incoterms 2020 does not mandate either the seller or the buyer to purchase cargo insurance under DPU.
However, since the seller bears the risk throughout transit and unloading at the destination, considering cargo insurance is essential for financial risk management.
Both parties should agree on the insurance scope, insured value, and liability handling procedures in case of loss.
In a DPU transaction, responsibilities are clearly divided. The seller undertakes most transportation and unloading obligations, while the buyer handles import customs clearance and accepts the goods after unloading.
Under DPU Incoterms 2020, the seller has the following primary responsibilities:
The buyer is responsible for:
|
Task
|
Seller
|
Buyer
|
|---|---|---|
|
Goods preparation
|
Responsible
|
No
|
|
Packaging
|
Responsible
|
No
|
|
Export clearance
|
Responsible
|
No
|
|
Transport to destination
|
Responsible
|
No
|
|
Unloading at destination
|
Responsible
|
No
|
|
Import clearance
|
No
|
Responsible
|
|
Import duties
|
No
|
Responsible
|
|
Receiving goods after unloading
|
No
|
Responsible
|
|
Risk before unloading is complete
|
Responsible
|
No
|
|
Risk after delivery is complete
|
No
|
Responsible
|
Note: The table above illustrates the principle of responsibility allocation under DPU. Certain incidental costs and document support obligations must be determined according to the contract and specific provisions of Incoterms 2020.
Under DPU, the seller bears most costs to bring the goods to the destination and complete unloading. Major cost items include:
|
Cost Item
|
Responsible Party
|
|---|---|
|
Goods packaging costs
|
Seller
|
|
Domestic transport in the exporting country
|
Seller
|
|
Export clearance fees
|
Seller
|
|
International freight
|
Seller
|
|
Transit costs (if any)
|
Seller
|
|
Transport to delivery location
|
Seller
|
|
Unloading costs at destination
|
Seller
|
|
Import clearance fees
|
Buyer
|
|
Import duties and related taxes
|
Buyer
|
|
Onward transport past delivery location
|
Buyer
|
Note: Certain port or terminal unloading charges may already be included in the freight contract. Parties should check to avoid double-charging or disputes over who pays.
DPU, DAP, and DDP all belong to Group D in Incoterms 2020. These terms require the seller to bring goods to the destination. However, differences lie in unloading obligations and import customs responsibilities.
These two terms are frequently confused because both require the seller to transport goods to the destination. The most critical difference is the unloading responsibility.
|
Criteria
|
DPU
|
DAP
|
|---|---|---|
|
Full name
|
Delivered at Place Unloaded
|
Delivered at Place
|
|
Transport to destination
|
Seller
|
Seller
|
|
Unloading at destination
|
Seller
|
Buyer
|
|
Risk transfer
|
After unloading
|
Before unloading
|
|
Export clearance
|
Seller
|
Seller
|
|
Import clearance
|
Buyer
|
Buyer
|
|
Import duties
|
Buyer
|
Buyer
|
|
Modes of transport
|
All modes
|
All modes
|
Example: A Vietnamese enterprise imports machinery from China and requests delivery to its factory in Binh Duong.
Thus, if the buyer wants the seller to handle unloading at the destination, DPU may be the more suitable choice.
DPU and DDP both require the seller to arrange transport to the destination, but differ in import customs responsibilities.
|
Criteria
|
DPU
|
DDP
|
|---|---|---|
|
Transport to destination
|
Seller
|
Seller
|
|
Unloading at destination
|
Seller
|
Buyer
|
|
Export clearance
|
Seller
|
Seller
|
|
Import clearance
|
Buyer
|
Seller
|
|
Import duties
|
Buyer
|
Seller
|
|
Risk transfer
|
After unloading
|
When goods arrive, ready for unloading
|
Note that DDP does not require the seller to unload goods at the delivery point. The seller must complete import procedures and pay import duties as prescribed. Meanwhile, DPU requires the seller to unload the goods, but the buyer is responsible for import customs clearance. Therefore, businesses must evaluate customs clearance capability in the importing country before selecting the appropriate term.
To better understand how DPU is applied, consider the following scenario:
Scenario: A Vietnamese enterprise imports a production line from China. Both parties agree on the delivery term: DPU – Buyer's factory in Binh Duong, Vietnam, Incoterms 2020.
Responsibilities are allocated as follows:
Through the example above, DPU suits transactions where the buyer wants the seller to handle both transportation and unloading at the destination. However, for oversized, heavy, or specialized equipment shipments, both parties must coordinate the unloading plan beforehand to avoid costs and risks.
DPU can benefit both buyer and seller if responsibilities are structured according to each party's operational capabilities.
DPU may be unsuitable if:
In these instances, DAP may serve as a better alternative since the seller is not obligated to unload at destination.
Although DPU offers convenience to buyers, companies must monitor several critical issues.
If contracts only list a city or port without precise delivery points, disputes over domestic transport costs and handover obligations may arise.
Solution: Clearly state exact addresses, delivery zones, and unloading points in contracts.
Certain commodities require forklifts, cranes, or specialized support gear. Without prior planning, delivery can face delays and unexpected expenses.
Solution: Evaluate cargo traits, weight, dimensions, and actual conditions at the delivery spot before signing contracts.
A common mistake assumes the seller handles all import responsibilities because they paid freight to destination. In reality, under DPU, the buyer handles import clearance and related taxes.
Solution: Clearly delineate customs duties, import licenses, taxes, and document requirements during early negotiations.
Beyond international freight, companies must factor in domestic transport, port fees, storage, unloading gear costs, and miscellaneous expenses.
Solution: Request detailed milestone-based logistics cost estimations from service providers.
Selecting proper Incoterms represents only the first step toward effective import-export operations. Businesses also need clear shipping plans, tight cost controls, and seamless workflow coordination.
VICO Logistics provides international transport and cargo solutions, supporting businesses across activities including:
Aimed at becoming a strategic supply chain partner, VICO Logistics helps enterprises optimize expenses, timelines, and operational risks in international trade.
DPU stands for Delivered at Place Unloaded, meaning delivery at place unloaded. This is one of 11 delivery terms under Incoterms 2020.
Yes. DPU applies to any mode of transport, including sea freight, air freight, road transport, rail transport, and multimodal shipments.
The seller is responsible for arranging and paying for unloading at the agreed delivery location. This is a unique trait of DPU within Incoterms 2020.
No. Under DPU, the buyer handles import customs clearance and pays import duties along with associated taxes.
The main difference lies in unloading duties. Under DPU, the seller must unload goods at destination. Under DAP, the seller delivers goods ready for unloading on the transport vehicle, leaving unloading responsibilities to the buyer.
No. Incoterms 2020 does not require either party to buy insurance under DPU. However, parties should consider insurance to mitigate transport risks.
DPU was introduced in Incoterms 2020 to replace DAT (Delivered at Terminal) from Incoterms 2010, allowing greater flexibility in delivery locations beyond terminal points.
DPU (Delivered at Place Unloaded) is an Incoterms 2020 delivery term where the seller arranges transport and unloads goods at the agreed destination. The buyer manages import clearance and associated duties.
Understanding exact responsibilities, expenses, and risk transition under DPU helps businesses select ideal trade terms, minimize disputes, and streamline international logistics operations.
Professional international transportation and supply chain solutions tailored for your business.
Get a quote now ↗Hotline / Zalo
(+84) 901 877 108WeChat (VN/EN)
miauyen1577Zalo
Office Hotline
(+852) 3759 9300WeChat ID
Schyler_skylarSenior member of international logistics and trade associations: Eurocham, JCtrans, VICOFA, VITAS, and more.